...
首页> 外文期刊>Power in Europe >Siemens plans 100 MW battery at Bavarian Wunsiedel electrolyzer site
【24h】

Siemens plans 100 MW battery at Bavarian Wunsiedel electrolyzer site

机译:西门子计划巴伐利亚Wunsiedel电解柜网站100 MW电池

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Siemens plans a 100 MW battery at Wunsiedel in Germany’s Bavaria state where it is currently constructing a 8.75 MW electrolyzer plant, it said July 19. Siemens Smart Infrastructure and Zukunftsenergie Nordostbayern (ZENOB) signed a letter of intent for the turnkey construction of a storage facility, it said. “Electricity storage facilities are an important building block for shaping the future of energy,” said Marco Krasser, managing director of local municipal utility SWW Wunsiedel, one of the partners in Zukunftsenergie Nordostbayern.
机译:西门子在德国巴伐利亚州的Wunsiedel计划了100兆瓦电池,目前正在建造8.75兆瓦的电解柜厂,7月19日。西门子智能基础设施和Zukunftsenergie Nordostbayern(Zenob)签署了一个储存设施的交钥匙建设的意向书。 , 它说。 “电力储存设施是一种重要的建筑块,用于塑造能源未来的能力,”Zukunftsenergie Nordostbayern的合作伙伴之一,当地市政公用事业SWWWunsiedel董事总经理Marco Krasser表示。

著录项

  • 来源
    《Power in Europe》 |2021年第852期|19-19|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号