首页> 外文期刊>Plant & civil engineer >£14million package to improve Castor Bay to Belfast water trunk main
【24h】

£14million package to improve Castor Bay to Belfast water trunk main

机译:1400万英镑的一揽子计划将蓖麻湾改建为贝尔法斯特水干渠

获取原文
获取原文并翻译 | 示例
           

摘要

The Castor Bay to Belfast water Trunk Main will involve laying a new 29 kilometres water pipeline from Castor Bay Water Treatment Works in Craigavon to south Lisburn, where the pipeline will link into an existing trunk main to transport the water supply on to Belfast. This major scheme will provide a vital source of water coming into Belfast, which will be especially important during future winters and in supplementing increased demand in the area. The project will continue until Summer 2015. The project will also involve improving the water infrastructure around the pipeline route, including upgrading the existing Castor Bay Water Pumping Station (Craigavon); a new water pumping station at Sprucefield and a new water pumping station at St. Andrews Service Reservoir (Temple).
机译:从蓖麻湾到贝尔法斯特干线干线将涉及铺设一条新的29公里的输水管道,从克雷加文的蓖麻湾水处理厂到南利斯本,该管线将连接到现有干线干线,以将供水输送到贝尔法斯特。这项主要计划将为进入贝尔法斯特的水提供重要的水源,这在未来的冬季以及补充该地区不断增长的需求方面尤其重要。该项目将持续到2015年夏季。该项目还将涉及改善管线周围的水基础设施,包括升级现有的Castor Bay抽水站(Craigavon);以及Sprucefield的新水泵站和St. Andrews Service Reservoir(Temple)的新水泵站。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号