...
首页> 外文期刊>Plant & civil engineer >New infrastructure output set to rise along with costs and tender prices
【24h】

New infrastructure output set to rise along with costs and tender prices

机译:新的基础设施产出将随着成本和投标价格的增长而增加

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

However, looking forward, BCIS' data shows that civil engineering costs - along with tender prices and new infrastructure output as a whole - will rise over the coming five-year period. Costs will rise by between 3.0% and 4.5% per annum, with both the price of materials and nationally agreed wage awards increasing. Tender prices are expected to rise by 4.3% between the first quarter of 2015 and the first quarter of 2016. The following year, another rise of 4.8% is predicted.
机译:然而,展望未来,BCIS的数据显示,土木工程成本以及招标价格和新基础设施的整体产出将在未来五年内上升。成本每年将上涨3.0%至4.5%,同时材料价格和国家认可的工资奖励都将增加。在2015年第一季度至2016年第一季度之间,招标价格预计将上涨4.3%。第二年,预计将再次上涨4.8%。

著录项

  • 来源
    《Plant & civil engineer》 |2015年第sepaaocta期|72-72|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号