首页> 外文期刊>Plant & civil engineer >REAL TIME MONITORING SYSTEM PREVENTS MAJOR WALL COLLAPSE IN CO DOWN
【24h】

REAL TIME MONITORING SYSTEM PREVENTS MAJOR WALL COLLAPSE IN CO DOWN

机译:实时监控系统防止了主要墙体坍塌

获取原文
获取原文并翻译 | 示例
           

摘要

The Ballynaclosha retaining wall was constructed in 1999 to enable the development of a fuel service station and ancillaries including buried and aboveground fuel storage to the lower side of the retaining wall. The upper side of the wall retains a section of the Ballynaclosha Road with two dwelling houses approximately 25m from the wall on the retained side. The 47m long cast in situ structure approximately 9m high was connected to the rear rock face via a single row of embedded anchors.
机译:Ballynaclosha挡土墙于1999年构建,以便能够在挡土墙的下侧的下侧开发燃料服务站和包括埋地和地上燃料存储的辅助件。 壁的上侧保留了一条Ballynaclosha公路的一部分,其中两个住宅距离保留侧的墙壁约25米。 通过单行嵌入式锚固锚固件大约9米高,47米长的铸造大约9米高。

著录项

  • 来源
    《Plant & civil engineer》 |2021年第julaaauga期|132-133|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号