首页> 外文期刊>Pipeline & gas journal >Alliance Pipeline Finishes '99 On Schedule, Within Budget
【24h】

Alliance Pipeline Finishes '99 On Schedule, Within Budget

机译:联盟管道按预算完成'99

获取原文
获取原文并翻译 | 示例
       

摘要

There's just nothing about the Alliance Pipeline project that isn't absolutely huge. First, look at the numbers. The $3 billion ($4.5 Canadian) project is the biggest non-recourse debt financed project in North American history, requiring the participation of more than 40 banks worldwide. The system will cover portions of three Canadian provinces and four states, consisting of 1,858 miles of mainline requiring more than 20 direc-tionally drilled crossings, 434 miles of laterals, 14 mainline and eight lateral compressor stations and a major liquids processing plant near Chicago.
机译:Alliance Pipeline项目没有什么不是绝对庞大的。首先,看一下数字。这项耗资30亿加元(合4.5加元)的项目是北美历史上最大的无追索权债务融资项目,需要全球40多家银行参与。该系统将覆盖加拿大三个省和四个州的部分地区,其中包括1858英里的干线,需要20多个定向钻穿的交叉口,434英里的支管,14个干线和八个侧向压缩机站以及位于芝加哥附近的主要液体加工厂。

著录项

  • 来源
    《Pipeline & gas journal》 |2000年第1期|p.28303234-38|共8页
  • 作者

    Jeff Share;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 管道运输;煤炭气化工业;
  • 关键词

  • 入库时间 2022-08-18 01:20:00

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号