首页> 外文期刊>Pipeline & gas journal >Work Under Way To Expand Pipeline
【24h】

Work Under Way To Expand Pipeline

机译:扩大管道的工作正在进行中

获取原文
获取原文并翻译 | 示例
       

摘要

The North American Construction Group has begun work on Kinder Morgan Canada's approximately C$443 million Anchor Loop project that involves the construction and operation of a pipeline loop with two segments along the existing Trans Mountain pipeline right-of-way. Beginning west of Hinton, Alta. a 30-inch diameter pipeline will cover the 4.7-mile distance to Hinton and then extend another 94 miles to Rearguard, BC using 36-inch diameter pipeline. The larger diameter pipe will eliminate any foreseeable need for future expansion of the project along its route through rugged terrain in Jasper National Park and Mount Robson Provincial Park.
机译:北美建设集团已开始进行金德摩根加拿大公司约4.43亿加元的Anchor Loop项目的工作,该项目涉及沿现有Trans Mountain管道通行权分为两个部分的管道环路的建设和运营。从Alta Hinton的西部开始。一条直径30英寸的管道将覆盖到欣顿4.7英里的距离,然后使用直径36英寸的管道再延伸94英里到卑诗省后卫。较大直径的管道将消除该项目未来通过贾斯珀国家公园和罗布森山省立公园崎terrain地形的路线的任何可预见的需求。

著录项

  • 来源
    《Pipeline & gas journal》 |2007年第10期|10|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 管道运输;煤炭气化工业;
  • 关键词

  • 入库时间 2022-08-18 01:18:22

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号