首页> 外文期刊>Pipeline & gas journal >InterMoor To Replace Wires On TLP's Mooring System
【24h】

InterMoor To Replace Wires On TLP's Mooring System

机译:InterMoor将更换TLP系泊系统上的电线

获取原文
获取原文并翻译 | 示例
       

摘要

InterMoor, an Acteon company, has been contracted by Shell Exploration & Production Company to replace the platform wires on the Auger TLP's lateral mooring system in the Gulf of Mexico. The eight platform wires that will be replaced on the Auger TLP are composed of non-jacketed spiral-strand wire. In addition to the offshore operations, InterMoor is performing the project management, engineering and fabrication of installation aids which includes a hang off porch that is to be fitted to the stern of the installation vessel to facilitate operations. DOF Subsea will provide the Skandi Skolten, a newly-built construction anchor handling vessel that will be utilized for the work. The vessel was scheduled to arrive in the Gulf in March 2011 and the project completed two months later in May.
机译:壳牌勘探与生产公司已与Acteon公司InterMoor签约,以更换Auger TLP在墨西哥湾的横向系泊系统上的平台钢丝。俄歇TLP上将要替换的八根平台线由无夹套螺旋绞线组成。除海上作业外,InterMoor还执行安装辅助工具的项目管理,工程和制造,安装辅助工具包括将安装在安装船尾部的悬挂式门廊,以方便操作。 DOF Subsea将提供Skandi Skolten,这是一艘新建的建筑锚装卸船,将用于该工程。该船原定于2011年3月抵达海湾,该项目在5月的两个月后完成。

著录项

  • 来源
    《Pipeline & gas journal》 |2011年第3期|p.106|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:17:34

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号