Headquartered in Spokane, WA with a service area of more than 30,000 square miles in eastern Washington, northern Idaho and parts of southern and eastern Oregon, Avista Utilities is embarking on a 20-year program to systematically replace 714 miles of plastic main piping and install transition tubing at the identified steel tees at a cost of about $10 million a year. The investor-owned utility serves about 323,000 natural gas customers and another 158,000 electric customers. In this interview, Mike Faulkenberry, a 20-year veteran with Avista and its director of Natural Gas, tells Pipeline & Gas Journal readers about the company's "reliability forecasting" for replacing aging pipe. He also touches on some of the scheduling considerations - such as pavement moratoriums for newly paved roads - that must be considered along the way. He adds that Avista expects the lag time between its infrastructure improvements and cost recovery to show improvement, once the program is fully ramped up.
机译:Avista Utilities总部位于华盛顿州斯波坎市,在华盛顿东部,爱达荷州北部以及俄勒冈州南部和东部部分地区的服务面积超过30,000平方英里,Avista Utilities正在着手一项为期20年的计划,以系统性地替换714英里的塑料主管道并进行安装在确定的三通处安装过渡管,每年的费用约为1000万美元。由投资者所有的公用事业公司为大约323,000个天然气客户和另外158,000个电力客户提供服务。在这次采访中,在Avista及其天然气部门担任了20年经验的老将Mike Faulkenberry向Pipeline&Gas Journal读者介绍了该公司对更换老化管道的“可靠性预测”。他还谈到了一些调度方面的考虑因素,例如一路上必须暂停的新铺装道路。他补充说,一旦计划全面启动,Avista预计其基础架构改进与成本回收之间的延迟时间将有所改善。

著录项

  • 来源
    《Pipeline & gas journal》 |2013年第6期|68-70|共3页
  • 作者

    Michael Reed;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:17:19

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号