首页> 外文期刊>Pipeline & gas journal >Tumbleweed Commits to New Gathering, Processing Agreements
【24h】

Tumbleweed Commits to New Gathering, Processing Agreements

机译:Tumbleweed致力于新的聚会,处理协议

获取原文
获取原文并翻译 | 示例
       

摘要

Tumbleweed Midstream executed three new long-term gathering and processing agreements that have quadrupled helium production at its Ladder Creek Helium Plant in eastern Colorado. The company's Ladder Creek Helium Plant and Gathering System serves natural gas producers operating in eastern Colorado and western Kansas. Two of the new agreements more than doubled the plant's inlet volume to 12 MMcf/d. The third contract is expected to increase production by another 3-5 MMcf/d over the next 90 days. The increased throughput from these three agreements will increase the plant's daily helium output to more than 200,000 cf/d. In addition, Tumbleweed has executed two new helium processing agreements with suppliers of raw helium who deliver their unpurified gaseous helium to the Ladder Creek plant by truck. Several new and existing producers in Colorado and Kansas have initiated exploration and development plans for helium-rich natural gas. Two existing step-out locations are being developed where previously drilled wells with helium-rich content have been stranded in the past. Current processing capacity at the Ladder Creek cryogenic processing plant is 40 MMcf/d, expandable to 50 MMcf/d. Tumbleweed expects that the plant could be at capacity within the next 12 to 24 months. The company will explore plant expansions as demand warrants. "I am very excited about the rapid increase of natural gas throughput and the expanded helium production at the Ladder Creek Helium Plant," said Tumbleweed founder and CEO Durell Johnson.
机译:Tumbleweed中游执行了三个新的长期收集和加工协议,在科罗拉多州东部的梯子溪氦厂拥有四倍氦气生产。该公司的梯子溪氦厂和集热系统供应在科罗拉多州东部和堪萨斯州的天然气生产商。两项新协议一倍多,植物的入口体积增加到12 mmcf / d。预计第三份合同将在未来90天内通过另外3-5 mmcf / d的产量增加。这三项协议的吞吐量增加将使植物的每日氦产量增加到200,000多次CF / D。此外,Tumbleweed还执行了两个新的氦气加工协议,并将其未享用的气态氦气通过卡车送到梯子小溪厂。科罗拉多州和堪萨斯州的一些新的和现有的生产商已经开始为富含氦的天然气进行探索和发展计划。正在开发出两个现有的轮廓位置,其中过去曾经落入过富氦含量的井。梯子溪低温加工厂的电流处理能力为40 mmcf / d,可扩展至50 mmcf / d。 Tumbleweed预计该植物可以在未来12到24个月内以容量。该公司将探索植物扩展作为需求保证。 “我非常兴奋地对天然气产量的快速增加以及梯子溪氦厂的扩大氦生产,”Tumbleweed创始人兼首席执行官Durell Johnson说。

著录项

  • 来源
    《Pipeline & gas journal》 |2020年第7期|62-62|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 21:44:06

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号