...
首页> 外文期刊>Pipeline & Gas Journal >Denali -The Alaska Gas Pipeline - On Track For 2010 Open Season
【24h】

Denali -The Alaska Gas Pipeline - On Track For 2010 Open Season

机译:Denali-阿拉斯加天然气管道-2010年开放季节如期进行

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In its Nov. 2 1 Project Update to the Alaska Legislature, Denali said work to estimate the cost of the pipeline and the Gas Treatment Plant (GTP) is nearing completion. A Fluor/ Worley Parsons joint venture (Arctic Solutions) is assisting with the GTP and Bechtel is assisting with the pipeline. Work is under way on a credible cost estimate to provide the basis for Denali's open season commercial offering. Denali has begun pre-open season discussions with potential anchor shippers.
机译:Denali在11月2日对阿拉斯加立法机构的1项目更新中表示,估算管道和天然气处理厂(GTP)成本的工作已接近完成。由Fluor / Worley Parsons合资企业(Arctic Solutions)协助GTP,Bechtel协助管道。正在进行可靠的成本估算,以为Denali的开放季节商业产品提供基础。 Denali已开始与潜在的主力托运人进行开放前的讨论。

著录项

  • 来源
    《Pipeline & Gas Journal》 |2010年第1期|p.42-42|共1页
  • 作者

    Anonymous;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号