...
首页> 外文期刊>Philippine Architecture, Engineering & Construction Record >Northrail construction work proceeds at accelerated pace
【24h】

Northrail construction work proceeds at accelerated pace

机译:北轨建设工程进展迅速

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The massive construction work on the 82-kilometer Northrail railway project, which will connect Caloocan City to the Clark Free Port in Pampaga, is now accelerating at a steady pace, following the resumption-of work in the first week of February.rnSecretary Edgardo Pamintuan, North Luzon Railways Corp. (Northrail) chairman, reported to President Arroyo during a recent Cabinet meeting at Clark that "every aspect, which would contribute to faster construction work will be explored and employed to cover for the delay of the project, which now runs to five years."
机译:继2月第一周恢复工作之后,长达82公里的Northrail铁路项目的大规模建设工程正在稳步加快,该工程将卡洛坎市与潘帕加的克拉克自由港连接起来。 ,北吕宋铁路公司(Northrail)董事长在最近在克拉克举行的内阁会议上向总统阿罗约报告说:“将探索并采用有助于加快施工进度的各个方面,以弥补该项目的延误。长达五年。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号