首页> 外文期刊>PetroMin >Bids & Pieces
【24h】

Bids & Pieces

机译:竞标件

获取原文
获取原文并翻译 | 示例
       

摘要

Santos Fires Up Gas Production Offshore Indonesia In early February Santos announced that gas production has commenced from the Wortel project in Indonesia. Wortel was sanctioned in November 2010, and is located in the Sampang Production Sharing Contract (PSC), offshore East Java in Indonesia. The Wortel development includes two gas wells, an unmanned wellhead platform and a 6-mile (10-kilometer) gas pipeline to the existing Santos-operated Oyong facilities. Gross gas production from the combined Oyong and Wortel fields is expected to be 90TJ/day. Gas will be exported via an existing pipeline to the Grati processing plant, where it is sold for domestic power generation.
机译:Santos加快了印尼海上天然气的生产2月初,Santos宣布印尼的Wortel项目已开始生产天然气。 Wortel于2010年11月获得批准,位于印度尼西亚东爪哇省的Sampang生产共享合同(PSC)中。 Wortel的开发项目包括两个气井,一个无人井口平台和一条通向Santos经营的Oyong现有设施的6英里(10公里)的天然气管道。 Oyong和Wortel气田的天然气总产量预计为90TJ /天。天然气将通过现有管道出口到Grati加工厂,并在那里出售用于国内发电。

著录项

  • 来源
    《PetroMin》 |2012年第1期|p.20-29|共10页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 23:56:44

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号