首页> 外文期刊>PCI Journal >Preliminary results and conclusions from the PRESSS five-story precast concrete test building
【24h】

Preliminary results and conclusions from the PRESSS five-story precast concrete test building

机译:PRESSS五层预制混凝土试验楼的初步结果和结论

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

A large-scale five-story precast concrete building constructed to 60 percent scale was tested under simulated seismic loading as the culmination of the 10-year PRESSS(Precast Seismic Structural Systems)research program. The building Comprised four different ductile structural frame Systems in one direction of response and a jointed Structural wall system in the orthogonal direction. The test structure was subjected to seismic input Levels equivalent to at least 50 percent higher than Those required for UBC(Uniform Building Code) Seismic Zone 4.
机译:作为为期10年的PRESSS(预制抗震结构系统)研究计划的最终成果,在模拟地震荷载下测试了建造成60%比例的大型五层预制混凝土建筑。该建筑物在一个响应方向上包含四个不同的延性结构框架系统,在正交方向上包含一个联合结构墙系统。测试结构承受的地震输入水平至少比UBC(统一建筑规范)地震区域4所要求的水平高出50%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号