Minimizing construction-related traffic delays and improving work zone safety on future projects have been two reasons for the New Hampshire Department of Transportation's (NHDOT) foray into rapid construction of bridges. The NHDOT has pursued project innovations that could significantly affect methods of design, detailing, and construction of bridges in the future. This bridge project replaced two existing spans with a 115 ft (35.1 m) single-span precast, prestressed concrete box beam superstructure and precast concrete substructure. The contract required the bridge to be assembled and ready for traffic in two weeks. The contractor accomplished the task in only eight days. This article focuses on the substructure details and how the project schedule, design, specifications, and contractual arrangements for a conventional bridge-replacement project are affected by specifying rapid bridge construction. The general consensus is that all parties involved in this project are pleased with the outcome of this job.
机译:新罕布什尔州交通运输部(NHDOT)努力快速建造桥梁的两个原因是,将与建筑相关的交通延误最小化,并改善未来项目的工作区安全性。 NHDOT追求的项目创新可能会在将来极大地影响桥梁的设计,细节设计和建造方法。该桥梁工程用115英尺(35.1 m)的单跨预制,预应力混凝土箱形梁上部结构和预制混凝土下部结构代替了两个现有跨度。合同要求将桥梁组装好,并在两周内准备通车。承包商仅在八天内就完成了任务。本文着重于子结构细节,以及如何通过指定快速桥梁建设来影响常规桥梁更换项目的项目进度,设计,规格和合同安排。普遍的共识是,参与该项目的所有各方对该工作的结果感到满意。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号