首页> 外文期刊>PCI Journal >Erecting long, vertical precast concrete members with one crane and two operating lines
【24h】

Erecting long, vertical precast concrete members with one crane and two operating lines

机译:用一台起重机和两条作业线安装长而垂直的预制混凝土构件

获取原文
获取原文并翻译 | 示例
           

摘要

Erect on of long, vertical precast concrete members from their as-delivered horizontal position to their vertical position in the structure involves devising handling procedures that protect the safety of the erection personnel while preventing the precast concrete member from cracking during the tilting procedure. The author investigates the most commonly used procedures, three-point and four-point rolling-block lifting systems, and identifies a common instability condition that causes sudden, uncontrolled rolling of the members as they are being tilted toward their vertical position. Methods are devised to detect in any member the potential for such instability, lo establish safe location of lifting devices and minimum lengths of crane slings to prevent this condition from occurring, and to analyze and control tensile stresses from causing cracking of long precast concrete wall panels as they are lifted from their horizontal position, rigged for the tilting operation.
机译:在结构中将长的垂直预制混凝土构件从交付时的水平位置竖立到其垂直位置涉及制定处理程序,以保护安装人员的安全,同时防止预制混凝土构件在倾斜过程中破裂。作者研究了最常用的程序(三点和四点滚动块举升系统),并确定了一种常见的不稳定状况,当零件向垂直位置倾斜时,会导致零件突然不受控制地滚动。设计了各种方法来检测任何潜在的不稳定因素,确定起重装置的安全位置以及最小的起重机吊索长度,以防止这种情况的发生,并分析和控制拉应力导致长的预制混凝土墙板开裂当将它们从水平位置提起时,要进行倾斜操作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号