...
首页> 外文期刊>PCI Journal >Oregon dock goes up in time for sea lions' arrival
【24h】

Oregon dock goes up in time for sea lions' arrival

机译:俄勒冈码头及时赶上海狮的到来

获取原文
获取原文并翻译 | 示例

摘要

When you are doing any kind of construction near environmentally fragile waterways, the less time you spend in the water the better. This is one of many reasons that the designers of the 17th Street Dock in Astoria, Ore., chose precast concrete for the deck design. "Precast was always the goal," says Howard Wells of BergerABAM in Portland, Ore., the engineer on the project. "We never considered anything else." The 17th Street Dock is home to two 210 ft (64 m) U.S. Coast Guard cutters, along with the historic lightship Columbia, an exhibit that is part of the adjacent Columbia River Maritime Museum. It's also a docking spot for Columbia River tour boats and small pleasure craft, making it a popular tourist destination.
机译:当您在环境脆弱的水道附近进行任何施工时,花在水中的时间越少越好。这是俄勒冈州阿斯托里亚市第17街码头的设计师选择预制混凝土进行甲板设计的众多原因之一。 “预制始终是目标,”该项目的工程师,位于俄勒冈州波特兰的BergerABAM的霍华德·威尔斯说。 “我们从未考虑过其他任何事情。” 17街码头是两个210英尺(64 m)美国海岸警卫队切工的住所,还有历史悠久的灯塔船哥伦比亚,该展览是毗邻的哥伦比亚河海事博物馆的一部分。它也是哥伦比亚河游船和小型游艇的停靠站,是受欢迎的旅游胜地。

著录项

  • 来源
    《PCI Journal 》 |2015年第1期| 49-49| 共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号