首页> 外文期刊>Paperi ja Puu >Black Wednesday only brought a partial solution
【24h】

Black Wednesday only brought a partial solution

机译:黑色星期三只带来了部分解决方案

获取原文
获取原文并翻译 | 示例
       

摘要

In September, UPM and Stora Enso announced massive cutbacks in production. Regardless of this, new reorganisation measures are expected in the forest industry. UPM and Stora Enso will have to continue their harsh measures. UPM and Stora Enso drew gloomy clouds over Finland and a couple of German mill locations on Wednesday, 10th September. Both Groups announced massive production cutbacks resulting in the loss of more than 1 000 jobs. Regardless of their identical timing and dramatic similarities, the management of the two Groups had ended up with slightly different solutions.
机译:9月,芬欧汇川和斯道拉恩索宣布减少生产。无论如何,预计林业行业将采取新的重组措施。芬欧汇川和斯道拉恩索将不得不继续采取严厉措施。芬欧汇川(UPM)和斯道拉恩索(Stora Enso)于9月10日(星期三)在芬兰和德国工厂的几个地点上空笼罩着阴暗的乌云。两组都宣布大规模减产,导致超过1000个工作岗位流失。不管它们的时间相同和相似之处如何,两个小组的管理层最终都采用了略有不同的解决方案。

著录项

  • 来源
    《Paperi ja Puu》 |2008年第6期|p.46-47|共2页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 造纸工业;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号