首页> 外文期刊>Packaging News >Greenstar plans new'super-MRF'
【24h】

Greenstar plans new'super-MRF'

机译:绿星计划推出新的“超级MRF”

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Greenstar UK, the waste management firm, has revealed plans to build an £l8m materials recycling facility (MRF) in London as part of wider plans to develop its UK network.rnThe firm has bought a 17,500m2 warehouse in Edmonton, north London, which it will develop into what it has termed a super-MRF. The facility will be able to process up to a tenth of all the waste produced in the north London area.rnThe company already has a licence for the site to process up to 250,000 tonnes of waste from the capital every year. In addition to this, it will process another 250,000 tonnes through its waste transfer station.
机译:废物管理公司Greenstar UK已透露计划在伦敦建立1800万英镑的材料回收设施(MRF),作为发展其英国网络的更广泛计划的一部分。该公司已在伦敦北部埃德蒙顿购买了一个17,500m2的仓库,它将发展成为所谓的超级MRF。该工厂将能够处理伦敦北部地区产生的所有废物的十分之一。该公司已经获得该场地的许可证,每年可处理来自首都的25万吨废物。除此之外,它将通过其废物转运站再处理25万吨。

著录项

  • 来源
    《Packaging News》 |2008年第9期|2|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号