Fugro has begun a pre-installation and route engineering survey project to support their client, Xtera, on NO-UK's major fiber-optic cable installation between Norway and the UK. Xtera has engaged Fugro to help make the NO-UK cable system one of the most secure data traffic routes across the North Sea by advising on final route selection and specifying the required burial conditions to minimize risk of cable damage from anchoring and trawling.
展开▼