Scheduling a single fire fighting resource with deteriorating fire suppression times and set-up times

机译:在抑制灭火时间和设置时间不断恶化的情况下安排单个灭火资源

获取原文
获取原文并翻译 | 示例
           

摘要

In fire fighting, time and effort required to control a fire increase if the beginning of the fire containment effort is delayed. The problem of scheduling a single fire fighting resource when there are N≥2 fires to be controlled may be tackled using the concept of deteriorating jobs for the time needed for fire suppression. This paper considers the problem in the case where set-up times are incorporated. The objective is to maximize the total value of the burnt areas remaining after the completion of the containment operation. A branch and bound algorithm is presented, using heuristic algorithms to obtain the upper bound and an initial lower bound. A dominance rule is also applied to reduce the time required for exploring the solution space.
机译:在灭火中,如果延缓灭火工作的开始,控制火势所需的时间和精力会增加。当有N≥2场火需要控制时,安排单个灭火资源的问题可以通过降低灭火所需时间的工作来解决。本文考虑了设置时间的问题。目的是使安全壳操作完成后剩余的燃烧区域的总价值最大化。提出了一种分支定界算法,使用启发式算法获得上限和初始下限。主导规则也适用于减少探索解决方案空间所需的时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号