首页> 外文期刊>OPEC Review >Investment risk allocation in decentralised electricity markets. The need of long-term contracts and vertical integration
【24h】

Investment risk allocation in decentralised electricity markets. The need of long-term contracts and vertical integration

机译:分散电力市场中的投资风险分配。长期合同和垂直整合的需求

获取原文
获取原文并翻译 | 示例
           

摘要

None of the far-reaching experiments in electricity industry liberalisation was able to ensure the timely and optimal capacity mix development. The theoretical market model features market failures due to the specific volatility of prices, and the difficulty of creating complete markets for hedging. In this paper, we focused on a specific failure, i.e. the impossibility of allocating the various risks borne by the producer onto suppliers and consumers in order to allow capacity development. Promotion of short-term competition by mandating vertical de-integration tends to distort investments in generation by impeding efficient risk allocation. Following Joskow's (2006) line, we developed an empirical analysis of hpw to secure investments in generation through vertical arrangements between decentralised generators and large purchasers, suppliers or consumers. Empirical observations as risk analysis shows that adopting such arrangements may prove necessary. Various types of long-term contracts between generators and suppliers (fixed-quantity and fixed-price contract, indexed price contract, tolling contract, financial option) appear to offer effective solutions for risk allocation. Vertical integration appears to be another effective way to allocate risk. But it remains an important complementary condition to efficient risk allocation, i.e. that retail competition is sticky or legally limited in order to have a large part of risks borne by consumers on the different market segments.
机译:电力行业自由化的影响深远的实验中,没有一个能够确保及时,最佳地发展容量组合。理论上的市场模型的特征是由于价格的特定波动性以及无法建立完整的对冲市场而导致的市场失灵。在本文中,我们集中于一个特定的失败,即不可能将生产者承担的各种风险分配给供应商和消费者,以进行能力开发。通过强制垂直整合来促进短期竞争,往往会阻碍有效的风险分配,从而扭曲发电投资。遵循Joskow(2006)的观点,我们对hpw进行了实证分析,以通过分散式发电机与大型购买者,供应商或消费者之间的垂直安排来确保对发电的投资。风险分析的经验观察表明,采取这种安排可能被证明是必要的。发电机和供应商之间的各种长期合同(定量和固定价格合同,指数价格合同,通行费合同,财务期权)似乎为风险分配提供了有效的解决方案。纵向整合似乎是分配风险的另一种有效方法。但这仍然是有效风险分配的重要补充条件,即零售竞争具有粘性或受到法律限制,以使很大一部分风险由不同市场领域的消费者承担。

著录项

  • 来源
    《OPEC Review》 |2008年第2期|p.150-183|共34页
  • 作者

    Dominique Finon;

  • 作者单位

    CIRED (Centre International de Recherche, sur I'Environnement et le Developpement), 45 bis, avenue de la Belle Gabrielle, F-94736 Nogent sur Marne Cedex, France;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 贸易经济;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号