首页> 外文期刊>Online >Rewiring A Working Library or Teaching An Old Dog New Tricks
【24h】

Rewiring A Working Library or Teaching An Old Dog New Tricks

机译:重新接线工作图书馆或教老狗新技巧

获取原文
获取原文并翻译 | 示例
       

摘要

hat does it take to install new network wiring in a building designed before the information revolution? One of the challenges brought about by new information tools is being able to provide the infrastructure to support new systems and services. The growth of new technologies has been so rapid that buildings designed and constructed even as recently as five years ago may not have data wiring adequate for today's networking needs, let alone the future's.
机译:在信息革命之前设计的建筑物中安装新的网络布线需要花费多少钱?新信息工具带来的挑战之一是如何提供支持新系统和服务的基础架构。新技术的增长是如此之快,以至于甚至在五年前,设计和建造的建筑物都可能没有足够的数据布线来满足当今的网络需求,更不用说未来的需求了。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号