首页> 外文期刊>Offshore >Minimizing drilling surprises in deepwater goal of live' drilling plan
【24h】

Minimizing drilling surprises in deepwater goal of live' drilling plan

机译:在现场钻探计划的深水目标中最大程度地减少钻探意外

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

A process-driven approach to drilling deep- water wells has been found to minimize surprises, increase drilling efficiency, reduce non-productive time, and lower costs. Integrated planning across disciplines is the key to the collaborative process, comparing a plan with new well measurements, updating it using these measurements, and quickly responding to deviations (surprises) from the plan. After the well is drilled, a careful review captures lessons learned for future deepwater projects.
机译:已经发现以过程驱动的方法来钻深水井可以最大程度地减少意外事件,提高钻井效率,减少非生产时间并降低成本。跨学科的综合计划是协作过程的关键,它可以将计划与新的油井测量值进行比较,使用这些测量值进行更新,并快速响应计划的偏差(意外)。钻完井后,进行认真的审查,以获取有关未来深水项目的经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号