...
首页> 外文期刊>Offshore >Insulated flowline system extends deepwater cool-down times
【24h】

Insulated flowline system extends deepwater cool-down times

机译:绝缘流水线系统延长了深水冷却时间

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Increasingly, large-scale deepwater developments are being based around a Spar, TLP, or FPSO linked to 30-100 km of insulated flowlines. A big concern for the operator is the potential impact of unscheduled production shutdowns. In these cases, the flow assurance system must provide sufficient time for the operator to react while preventing formation of hydrates or wax. Typically, there will be a "no touch" time of around two to six hours during which production can be resumed without further action on the pipelines. Then follows a longer period (10-20 hrs) in which hydrate-prone fluids are ushered out of the flowlines and replaced by inert fluids. In either case, the brevity of the no-touch period rarely allows replace-ment equipment to be drafted in, so the production facilities must essentially be autonomous, with back-up mandatory for all-important items.
机译:越来越多的大型深水开发项目围绕与30-100 km的绝热流水线相连的Spar,TLP或FPSO进行。对于运营商而言,最大的担忧是计划外生产停工的潜在影响。在这些情况下,流量保证系统必须为操作员提供足够的时间进行反应,同时防止水合物或蜡的形成。通常,将有大约2到6个小时的“无接触”时间,在此期间可以恢复生产而无需对管道进行进一步的操作。然后是一段较长的时间(10-20小时),在此期间,易水化的流体会从流水线中引出,并被惰性流体代替。在这两种情况下,非接触期的短暂性都很少允许更换设备的草拟,因此生产设备必须基本上是自治的,所有重要物品都必须有备用设备。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号