...
首页> 外文期刊>Offshore >Subsea installations running smoothly at Girassol
【24h】

Subsea installations running smoothly at Girassol

机译:吉拉斯索尔的海底设施运行顺利

获取原文
获取原文并翻译 | 示例
           

摘要

Installation contractors are marshalling their resources in West Africa for at least 15 new deepwater projects. Physically, the challenge can be met, according to the market leader Stolt Offshore. Financially, problems may arise if operators over-extend their technical brief. Stolt Offshore has had first-hand experience of these issues with two current projects off Angola and Nigeria. Girassol Phase 1 was one of the world's most ambitious deepwater programs, involving untried insulation and connection technologies and a large vessel spread. But the concept proved to be technically and economically sound.
机译:安装承包商正在为至少15个新的深水项目在西非调集资源。市场领导者Stolt Offshore表示,从物理上讲,挑战可以解决。在财务上,如果运营商过度延长其技术简介可能会出现问题。 Stolt Offshore已在安哥拉和尼日利亚附近的两个当前项目中对这些问题拥有第一手经验。吉拉索尔一期工程是世界上最雄心勃勃的深水计划之一,涉及未经尝试的绝缘和连接技术以及大型船只。但事实证明该概念在技术和经济上都是合理的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号