Temporary on-site power system allows full-scale testing of pump packages for deepwater platform

机译:临时现场电源系统可对深水平台的泵组进行全面测试

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

When Total E & P USA, Houston, contracted with Integrated Flow Solutions (IFS) to design and install two key pumping systems for the $195 million Matterhorn deepwater production facility in the Gulf of Mexico, it was critical that all offshore equipment operate reliably from start-up. This was particularly true of the two pumping packages, which handle water injection and oil export streams, respectively. IFS assigned high priority to pre-installation testing of all phases of both pumping packages, which were destined for installation aboard the Matterhorn offshore facility, a mini-tension leg platform (TLP). Prior to integrating the equipment aboard the topsides production module, Total and IFS required extensive tests to make sure the pumps and motor drives met project specifications and that final assembly of the packages would take a minimum of commissioning time. But there was a major challenge: The pumping systems' high horsepower ratings required more electric power than was available at the time at the IFS manufacturing facility.
机译:当美国休斯敦Total E&P USA与Integrated Flow Solutions(IFS)签订合同,为墨西哥湾价值1.95亿美元的Matterhorn深水生产设施设计并安装两个关键的泵送系统时,至关重要的是,所有海上设备从一开始就必须可靠地运行-向上。对于两个分别处理注水和输油流的抽油机来说尤其如此。 IFS将两个抽油烟机各个阶段的预安装测试放在了优​​先位置,这些抽油泵准备在微型张力腿平台(TLP)的Matterhorn海上设施上进行安装。在将设备集成到顶部生产模块上之前,Total和IFS需要进行大量测试,以确保泵和电动机驱动器符合项目规格,并且最终组装组件将花费最少的调试时间。但是存在一个重大挑战:泵系统的高功率额定值需要比IFS制造工厂当时更多的电力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号