...
首页> 外文期刊>Offshore >Eliminating formation damage, reducing rig timo
【24h】

Eliminating formation damage, reducing rig timo

机译:消除地层损坏,减少钻机调高

获取原文
获取原文并翻译 | 示例
           

摘要

Baker Oil Tools developed a new tech-nology for completing wells in unconsolidated formations. The technology and technique is installing a liner hanger and sand control mechanism in a single trip to eliminate explosive perforation charges and associated formation damage risk. The BOT personnel can run production liner, flow conduit, primary cementing, and sand control tools in a single trip resulting in cost reduction. A Joint Investment Project (JIP) that included three major operators, a large service provider, and a small technology company, with the help of a grant from the Department of Energy, developed this new technology. Formation damage caused by perforating is one of the highest risks in well completions. Common types of damage that can occur inside the perforation tunnel are fractured and compacted zones, perforation gun debris, and broken formation blockages. Reducing or eliminating initial perforation damage results in a more productive well over its lifetime. BOT's new completion method eliminates gravel packing and minimizes intervention in completion operations, saving substantial rig time. It also simplifies operation logistics, especially in remote or offshore environments.
机译:贝克石油工具公司开发了一种新技术,用于完成疏松地层中的油井。该技术是在单程中安装衬管悬挂器和防砂机构,以消除爆炸性射孔弹和相关的地层损坏风险。 BOT人员可以单次运行生产衬管,导流管,基础固井和防砂工具,从而降低了成本。这项由三大运营商,一家大型服务提供商和一家小型技术公司组成的联合投资项目(JIP)在能源部的资助下开发了这项新技术。射孔造成的地层损坏是完井中最高的风险之一。射孔隧道内可能发生的常见损坏类型是破裂和压实区,射孔枪碎屑和破碎的地层阻塞。减少或消除最初的穿孔损伤,可以在整个使用寿命内提高生产效率。 BOT的新完井方法消除了砾石堆积,并最大限度地减少了对完井作业的干预,从而节省了大量的钻机时间。它还简化了操作物流,尤其是在偏远或海上环境中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号