...
首页> 外文期刊>Offshore >BG submits plan for Pi-Armada tieback
【24h】

BG submits plan for Pi-Armada tieback

机译:BG提交Pi-Armada附加赛计划

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

BG Norge is gearing up for its first operated development in the Norwegian sector of the North Sea. The company plans to tie the Pi field across the North Sea median line to its Armada platform complex in the UK sector, the fourth subsea tieback to these facilities.rnPi consists of two structures, north and south. The latter was discovered by a previous operator in block 6/3, while BG discovered Pi North in 2008 with exploration well 15/12-19. The two combined present a commercial proposition, with estimated reserves of 5.7 MMbbl of oil and condensate and 2 bcm (70.5 bcf) of gas.
机译:BG Norge正在为北海挪威地区的第一个运营开发做准备。该公司计划将横跨北海中线的Pi油田与其英国地区的Armada平台综合设施连接起来,这是对这些设施的第四次海底绑扎。rnPi由北和南两个结构组成。后者是由先前的一个作业者在6/3区块中发现的,而BG于2008年在15 / 12-19的勘探井中发现了Pi North。两者合起来提出了一个商业提议,估计储量为5.7 MMbbl的石油和凝析油和2 bcm(70.5 bcf)的天然气。

著录项

  • 来源
    《Offshore》 |2010年第4期|p.102|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号