Installing offshore facilities in shallow water presents a unique set of challenges, both physical and commercial. For many years, the offshore industry has turned to high deck mating floatover installation techniques in these conditions as an alternative to heavy-lift construction vessels. But for the Zhao Dong block development offshore China, water depth, tidal patterns, and barge availability required a different approach.
展开▼