首页> 外文期刊>Offshore >Safety lifecycle management can prove challenging for upstream assets
【24h】

Safety lifecycle management can prove challenging for upstream assets

机译:安全生命周期管理可能对上游资产构成挑战

获取原文
获取原文并翻译 | 示例
           

摘要

Even though mandated by functional and process safety standards such as ISA-84 and ISA/IEC 61511, many automation and safety instrumented systems (SIS) vendors do not provide safety lifecycle management software that extends beyond the initial work performed to commission the SIS logic solver. For upstream assets, this initial work was likely to be performed in a different location than where the platform achieves its first oil. Therefore, when the owner-operator has achieved this important milestone, only the bare minimum safety instrumented function proof testing for the most critical protective and mitigative functions has been performed.
机译:即使受到诸如ISA-84和ISA / IEC 61511之类的功能和过程安全标准的强制要求,许多自动化和安全仪表系统(SIS)供应商仍未提供安全生命周期管理软件,其范围超出了调试SIS逻辑求解器的初始工作范围。对于上游资产,该初始工作可能会在与平台实现首次采油的位置不同的位置进行。因此,当所有者-操作员达到这一重要里程碑时,仅执行了针对最关键的保护和缓解功能的最低限度的最低安全仪表功能验证测试。

著录项

  • 来源
    《Offshore》 |2015年第7期|30-31|共2页
  • 作者

    Joseph Scalia;

  • 作者单位

    ARC Advisory Group;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号