首页> 外文期刊>Offshore >Weatherford develops new Sakhalin-ready retainer, bridge plug
【24h】

Weatherford develops new Sakhalin-ready retainer, bridge plug

机译:Weatherford开发了新的萨哈林就绪固定器,桥塞

获取原文
获取原文并翻译 | 示例
           

摘要

Weatherford International pIc has developed and deployed a cement retainer and bridge plug for use in wells in Sakhalin Island, Russia. After identifying a need for a higher-performance cement retainer and bridge plug to provide isolation in wells, a major operator in Sakhalin Island contacted Weatherford to develop a technology that reliably meets new, more stringent, industry standards. Its engineering team then enhanced an existing, proven proprietary design, and then conducted testing of the new retainer and bridge plug according to American Petroleum Institute Specification 11D1. The new design achieved the desired V3 rating.
机译:Weatherford International pc已经开发并部署了一种水泥护圈和桥塞,用于俄罗斯萨哈林岛的油井。在确定需要高性能水泥护圈和桥塞以实现井间隔离之后,萨哈林岛的一家主要运营商联系了Weatherford,以开发一种可靠地满足新的,更严格的行业标准的技术。然后,其工程团队对现有的,经过验证的专有设计进行了改进,然后根据美国石油协会规范11D1对新的固定器和桥塞进行了测试。新设计达到了所需的V3等级。

著录项

  • 来源
    《Offshore》 |2017年第4期|67-67|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号