首页> 外文期刊>Offshore >Standardized FPSO offers potentially major schedule, cost gains
【24h】

Standardized FPSO offers potentially major schedule, cost gains

机译:标准化的FPSO提供了可能的主要计划,并增加了成本

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Earlier this year, construction started in Shanghai of SBM Offshore's first 'Fast4Ward' FPSO. This is a new concept based on a standard, multi-purpose newbuild hull supporting topsides that also involve a high degree of standardization. It is a unique combination which the company claims can accelerate delivery of the FPSO by up to one year, improve construction efficiency, and cut typical project costs by over $500 million. Both ABS and Bureau Veritas have issued Basic Design Approval for the generic hull.
机译:今年早些时候,SBM Offshore的第一台“ Fast4Ward” FPSO在上海开始建设。这是一个新概念,它基于标准的多用途Newbuild船体,该船体支持顶部,并且还涉及高度标准化。这是一个独特的组合,该公司声称可以将FPSO的交付速度加快最多一年,提高施工效率,并减少超过5亿美元的典型项目成本。 ABS和必维国际检验集团均已发布了通用船体的基本设计批准书。

著录项

  • 来源
    《Offshore》 |2018年第6期|41-42|共2页
  • 作者

    Jeremy Beckman;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号