首页> 外文期刊>Offshore >Subsea power system opens way to longer-distance deepwater step-outs
【24h】

Subsea power system opens way to longer-distance deepwater step-outs

机译:海底电力系统为长距离深水作业开辟了道路

获取原文
获取原文并翻译 | 示例
           

摘要

ABB HAS COMPLETED a 3,000-hr shallow-water test of its world-first subsea power distribution and conversion technology system. All building blocks are now proven for the development, which started in 2013 under a $100-million joint industry project (JIP) supported by Equinor, Total, Chevron, and the Research Council of Norway. The main goals were to qualify the system's capability to ensure reliable power supply of up to 100 MW, in water depths down to 3,000 m (9,842 ft), and over distances of up to 600 km (373 mi) via a single cable.
机译:ABB已完成了其全球首个海底配电和转换技术系统的3,000小时浅水测试。现已证明所有开发模块均可用于该开发项目。该项目于2013年启动,耗资1亿美元,由Equinor,Total,Chevron和挪威研究理事会资助的联合工业项目(JIP)。主要目标是验证系统的能力,以确保通过单根电缆在不超过3,000 m(9,842 ft)的水深以及600 km(373 mi)的最大距离内提供高达100 MW的可靠电源。

著录项

  • 来源
    《Offshore》 |2020年第2期|32-35|共4页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号