首页> 外文期刊>Offshore Support Journal >Naval architect is ready for new challenges
【24h】

Naval architect is ready for new challenges

机译:海军建筑师已准备好应对新挑战

获取原文
获取原文并翻译 | 示例
           

摘要

Interviewed early in 2015, Mr Perla described 2014 as "an average year" for Guido Perla & Associates (GPA), one that saw the company respond to enquiries with a high level of proposals but that was adversely affected at yards building GPA designs and increasingly was overshadowed by the potential adverse effects of the downturn in the oil price. The question on everybody's lips, says Mr Perla, is whether the price downturn will be a short-term one or more prolonged and what effect it will have on the offshore vessel market in which GPA has specialised for several years. Whatever the outcome, he says, GPA has always designed a mix of vessels and is not wholly dependent on the offshore vessel industry.
机译:在2015年初接受采访时,Perla先生将2014年视为Guido Perla&Associates(GPA)的“平均年”,这一年看到该公司以高水平的建议来回应询价,但在建造GPA设计的造船厂受到了不利影响,并且这种影响日益增加油价下跌的潜在不利影响使它黯然失色。佩尔拉先生说,每个人的问题是价格下跌是否会是短期的或更长的持续时间,以及它将对GPA专门研究了几年的海上船舶市场产生什么影响。他说,无论结果如何,GPA始终设计各种船舶,并不完全依赖于海上船舶行业。

著录项

  • 来源
    《Offshore Support Journal》 |2015年第1期|114-115|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号