首页> 外文期刊>Offshore Support Journal >SEACOR CEO PREPARED TO WAIT FOR CONSOLIDATION
【24h】

SEACOR CEO PREPARED TO WAIT FOR CONSOLIDATION

机译:SEACOR CEO准备等待合并

获取原文
获取原文并翻译 | 示例
           

摘要

Oversupply may be the word on everybody's lips -along with the oil price - but Charles Fabrikant, chief executive of Seacor Holdings, believes that there is another issue affecting the industry: its highly fragmented nature. Speaking exclusively to OSJ at the end of 2016, Mr Fabrikant - who will provide the opening keynote at the 2017 Annual Offshore Support Journal Conference, Awards & Exhibition, which takes place 8-9 February 2017, London - said that although excess capacity is undoubtedly the offshore support vessel (OSV) industry's biggest problem right now, fragmentation is another important one and has been for a long time.
机译:供过于求可能是每个人的口头禅-以及油价-但Seacor Holdings首席执行官查尔斯·法布里坎特(Charles Fabrikant)认为,还有另一个问题影响着该行业:其高度分散的性质。 Fabrikant先生将于2016年底在OSJ上发表独家讲话,他将在2017年2月8日至9日在伦敦举行的2017年度离岸支持期刊大会暨颁奖暨展览上发表开幕式主题演讲。他说,尽管产能过剩无疑是无疑的。目前,海上支援舰(OSV)行业面临的最大问题是,碎片化是另一个重要问题,而且已经存在了很长时间。

著录项

  • 来源
    《Offshore Support Journal》 |2017年第1期|11-12|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号