首页> 外文期刊>Offshore Support Journal >New heavy-lifting capacity for next-gen wind projects
【24h】

New heavy-lifting capacity for next-gen wind projects

机译:下一代风能项目的新重装能力

获取原文
获取原文并翻译 | 示例
           

摘要

Under construction at COSCO Shipping Heavy Industry in China, Jan De Nul's latest offshore jack-up installation vessel is set for delivery in 2022. Offshore wind turbines are growing in size with successive generations - turbines can now reach as high as 270 m, with blades up to 120 m. Installation vessel operators therefore face a challenge in ensuring their vessels have lifting capacity to handle such large, heavy loads. Jan De Nul has awarded Netherlands-based lifting specialist Huisman a contract for design, engineering, construction and delivery of the main crane on Voltaire. Huisman will construct the crane at its Xiamen, China, production facility, and it will be installed at the COSCO yard.
机译:Jan De Nul最新的海上自升式安装船正在中国中远海运重工建造中,计划于2022年交付。海上风力涡轮机的规模不断扩大,其后世代-如今,带叶片的风力涡轮机最高可达270 m高达120 m。因此,安装船的操作员在确保其船具有提升能力以应对如此大的重载荷方面面临挑战。 Jan De Nul已与荷兰起重专家Huisman签定了伏尔泰主要起重机的设计,工程,建造和交付合同。豪氏威马将在中国厦门的生产工厂建造该起重机,并将其安装在中远船坞。

著录项

  • 来源
    《Offshore Support Journal》 |2019年第7期|38-38|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号