【24h】

MIDDLE EAST

机译:中东

获取原文
获取原文并翻译 | 示例
           

摘要

With traditional work such as rig tow or rig support slowing down, vessel owners have enthusiastically plunged into a new upcoming field where an increasing number of boats are suddenly needed - seismic support work. Saudi Aramco had earlier awarded two survey contracts worth USD 375 million to Argas, a CGGVeritas joint venture company, and the first contract commenced in June for 18 months, while the second will start in October for 24 months. The contracts respectively have 18 and 24-month optional extension periods. This translates to the requirement of eight support vessels, of which the Tidewater trio, consisting of the Mawford Tide, Bergeron Tide and Lecompte Tide, all 5,150 bhp AHTS, Topaz Marine's DMS Courageous 2,200 dwt PSV and Swire Pacific's Pacific Supporter 5,440 bhp AHTS, have started work on the term contract.
机译:随着钻机拖曳或钻机支撑等传统工作的放缓,船主们热情地投入了一个新的即将到来的领域,该领域突然需要越来越多的船只-地震支撑工作。沙特阿美石油公司早些时候向CGGVeritas的一家合资公司Argas授予了两份价值3.75亿美元的测量合同,第一份合同于6月开始,为期18个月,第二份合同于10月开始,为期24个月。合同分别具有18个月和24个月的可选扩展期。这意味着需要八艘支持船,其中包括Mawford浪潮,Bergeron浪潮和Lecompte浪潮的Tidewater三人船,所有5,150 hphp AHTS,Topaz Marine的DMS Courageous 2,200 dwt PSV和太古公司的Pacific Supporter 5,440 hphp AHTS开始定期合同的工作。

著录项

  • 来源
    《Offshore marine monthly》 |2010年第8期|P.6-7|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号