...
首页> 外文期刊>Offshore Engineer >Staying ahead of downtime
【24h】

Staying ahead of downtime

机译:提前停机

获取原文
获取原文并翻译 | 示例
           

摘要

Minimizing downtime is a goal for every offshore oil and gas operation. But, a number of modern challenges can make it especially difficult to achieve. For starters, the advanced control systems used in offshore operations can require operators to interface with hundreds or thousands of data tags and resulting alarms. For many oil and gas producers, the approach used to deliver this data to operators involves populating as much of it as possible on a single HMI (human machine interface) screen. This can overwhelm operators and result in them missing important data or alarms before a downtime event occurs.
机译:最大限度地减少停机时间是每个海上油气运营的目标。但是,许多现代挑战可能使其尤其难以实现。首先,海上作业中使用的高级控制系统可能要求操作员与成百上千的数据标签和由此产生的警报进行交互。对于许多石油和天然气生产商而言,用于将这些数据传递给操作员的方法涉及在单个HMI(人机界面)屏幕上填充尽可能多的数据。这可能会使操作员不知所措,并导致他们在发生停机事件之前丢失重要数据或警报。

著录项

  • 来源
    《Offshore Engineer》 |2016年第7期|50-51|共2页
  • 作者

    Luis Gamboa;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号