Taiwan has set itself an ambitious offshore energy target, using both offshore wind and marine energy, to get itself off nuclear power by 2025, with 20% renewable energy by the same date. To do this, the country wants to build out 3GW of offshore wind capacity by 2025, and increase that to 4GW by 2030. To put that in context, the UK, which has led European offshore wind build out, has 5GW installed to date, while Taiwan has just 8MW.
展开▼