首页> 外文期刊>Nuclear Weapons & Materials Monitor >A Year After Pausing Plutonium Operations, Two-Thirds of Los Alamos PF-4 Work Back Up
【24h】

A Year After Pausing Plutonium Operations, Two-Thirds of Los Alamos PF-4 Work Back Up

机译:在暂停P运行一年后,三分之二的洛斯阿拉莫斯PF-4进行了备份

获取原文
获取原文并翻译 | 示例
       

摘要

Los Alamos National Laboratory has resumed about two-thirds of work at its Plutonium Facility after operationsrnwere shut down a year ago due to criticality safety and conduct of operations issues, a senior laboratory officialrnsaid this week, but there is no clear timetable for a full resumption of activities. A recently released May 30rnDefense Nuclear Facilities Safety Board site representative report suggested that a “large number” of fissilernmaterial operations were slated to be restarted before the end of June, noting that a “war room” had beenrnestablished to support seven-day-a-week efforts to restart operations in the facility. In addition to the work that hasrnbeen restarted, the lab official said “many more are in the normal resumption process, to include internal andrnexternal readiness assessments for activities that have been substantially improved or are undergoing significantrnequipment upgrades.”
机译:洛斯阿拉莫斯国家实验室的一名高级官员本周表示,由于关键安全和操作问题,一年前停运后,洛斯阿拉莫斯国家实验室的resume设施已恢复了约三分之二的工作,但尚无明确的时间表全面恢复活动。国防核设施安全委员会最近的一份5月30日发布的站点代表报告显示,计划在6月底之前重新启动“大量”的裂变材料运营,并指出已经建立了一个“作战室”来支持7天一一周的工作以重新启动设施中的操作。除了已经重新开始的工作之外,实验室官员说:“还有更多的工作处于正常的恢复过程中,其中包括对已经大大改善或正在进行重大设备升级的活动的内部和外部准备情况评估。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号