...
首页> 外文期刊>Nuclear Weapons & Materials Monitor >NNSA: MOX Facility 27 Percent Complete, Will Cost $17B
【24h】

NNSA: MOX Facility 27 Percent Complete, Will Cost $17B

机译:NNSA:MOX设施完成27%,将花费$ 17B

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The Mixed Oxide Fuel Fabrication Facility (MFFF) is only 27 percent complete and will cost $17.2 billion, including the $5rnbillion already spent, according to a recent cost estimate from the U.S. Army Corps of Engineers.rnOfficials with the National Nuclear Security Administration discussed the estimate Thursday during a media briefing andrntour of the facility, located at the Savannah River Site near Aiken, S.C. Nuclear Security & Deterrence Monitor did notrnattend the tour but followed up with the NNSA for comment.
机译:根据美国陆军工程兵团最近的成本估算,混合氧化物燃料制造设施(MFFF)仅完成了27%,将耗资172亿美元,其中包括已经花费的50亿美元。估计周四在位于艾肯附近萨凡纳河工地的该设施的媒体发布会上,SC核安保和威慑监测员没有参加巡回演出,但随后对NNSA进行了评论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号