首页> 外文期刊>Nuclear Security & Deterrence Monitor >Acting DOE Nuke Boss Won’t Play Down Pit Costs in Armed Services Hearing
【24h】

Acting DOE Nuke Boss Won’t Play Down Pit Costs in Armed Services Hearing

机译:代理Doe Nuke Boss不会在武装服务听证会上发挥坑成本

获取原文
获取原文并翻译 | 示例
           

摘要

The acting head of DOE nuclear weapons programs on Thursday passed on a chance to say that a planned plutonium pit factory in South Carolina will cost as much per unit as a cheaper pit factory planned for New Mexico. The National Nuclear Security Administration (NNSA) plans a larger pit factory, the Savannah River Plutonium Production Facility (SRPPF), at the Savannah River Site in Aiken, S.C., and a smaller pit factory, the Los Alamos Plutonium Pit Production Plant, at the Los Alamos National Laboratory in New Mexico.
机译:周四的Doe核武器计划的代理负责人通过机会说,南卡罗来纳州南卡罗来纳州的计划钚厂将每单位成本为新墨西哥州的更便宜的坑厂。 国家核安全管理局(NNSA)计划了一个较大的坑厂,萨凡纳河钚生产设施(SRPPF),位于Aiken,SC和一个较小的坑厂,洛杉矶阿拉莫斯钚坑生产厂的萨凡纳河河网站 洛杉矶阿拉莫斯国家实验室在新墨西哥州。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号