首页> 外文期刊>Nuclear Weapons & Materials Monitor >MOX Services Played Fast and Loose With Subcontract Costs, DOE IG Says
【24h】

MOX Services Played Fast and Loose With Subcontract Costs, DOE IG Says

机译:DOE IG表示,MOX服务在分包成本方面发挥了快速而宽松的作用

获取原文
获取原文并翻译 | 示例
           

摘要

MOX Services, prime contractor for the canceled Mixed Oxide Fuel Fabrication Facility (MFFF), played fast and loosewith federal contracting rules, the U.S. Department of Energy’s inspector general wrote in a scathing report publisheddays before the winter holidays.The audit, which focused on MOX Services’ administration of project subcontractors, identified some $8.5 million inquestionable costs claimed in 2015: the year before DOE first asked for Congress’ permission to stop construction of theplant at the Savannah River Site in South Carolina.
机译:美国能源部监察长在寒假前几天发布的严厉报告中写道,MOX Services是取消的混合氧化物燃料制造设施(MFFF)的主要承包商,其联邦合同规定起着快速和宽松的作用。服务部的项目分包商管理部门在2015年确定了约850万美元的可疑成本:美国能源部(DOE)首次要求国会批准在南卡罗来纳州的萨凡纳河工地停止该工厂的建设的前一年。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号