BWX Technologies is about halfway through repairing 12 submarine missile tubes it welded incorrectly in 2018, RexGeveden, president and CEO of the Lynchburg, Va., nuclear-hardware and fuel provider told investors Tuesday.Under multiple subcontracts to Columbia- and Virginia-class submarine production prime General Dynamics Electric Boat,BWXT is on the hook to deliver tubes through 2021. The latest contract alone calls for the company to produce 26 tubesby that point.
展开▼
机译:弗吉尼亚州林奇堡市的核硬件和燃料供应商总裁兼首席执行官雷克斯 r n格维登周二告诉投资者,BWX Technologies大约在修复其在2018年焊接不正确的12条海底导弹管的一半。 r n根据多项分包合同,哥伦比亚和弗吉尼亚级潜艇生产的主要动力通用电动船, r nBWXT有望在2021年之前交付电子管。仅此一项最新合同就要求该公司在那时之前生产26个电子管。
展开▼