首页> 外文期刊>Nuclear waste news >NRC Issus Final Safety Evaluation Report On Operating License for Columbia Station
【24h】

NRC Issus Final Safety Evaluation Report On Operating License for Columbia Station

机译:NRC Issus关于哥伦比亚站运行许可证的最终安全评估报告

获取原文
获取原文并翻译 | 示例
           

摘要

The Nuclear Regulatory Commission has issued its final safety evaluation report for the proposed renewal of the operating license for the Columbia Generating Station, concluding there are no open items that would preclude license renewal for an additional 20 years of operation. Energy Northwest submitted an application to the NRC in January 2010, to extend the plant licenses by 20 years for each unit at the facility, located on the Columbia River approximately 160 miles southeast of Seattle, Wash. The current 40-year operating license for Columbia is due to expire on Dec. 20, 2023.
机译:核监管委员会已经发布了有关哥伦比亚发电站的营业执照拟议续期的最终安全评估报告,其中得出结论认为,没有任何开放项目会阻止续签20年的营业执照。西北能源公司于2010年1月向NRC提交了一份申请,将位于华盛顿州西雅图市东南160英里处的哥伦比亚河上的该设施的每个装置的工厂许可证延长20年。当前哥伦比亚的40年经营许可证将于2023年12月20日到期。

著录项

  • 来源
    《Nuclear waste news》 |2012年第6期|8-8|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号