...
首页> 外文期刊>Nuclear waste news >Germany Faces Massive Nuclear Waste Problem as it Prepares to Close all Plants
【24h】

Germany Faces Massive Nuclear Waste Problem as it Prepares to Close all Plants

机译:德国准备关闭所有工厂时面临巨大的核废料问题

获取原文
获取原文并翻译 | 示例

摘要

When it comes to the big questions plaguing the world's scientists, they don't get much larger than this. Where do you safely bury more than 28,000 cubic meters ~ roughly six Big Ben clock towers - of deadly radioactive waste for the next million years? This is the "wicked problem" facing Germany as it closes all of its nuclear power plants in the coming years, according to Professor Miranda Schreurs, part of the team searching for a storage site. Experts are now hunting for somewhere to bury almost 2,000 containers of high-level radioactive waste. The site must be beyond rock-solid, with no groundwater or earthquakes that could cause a leakage.
机译:当涉及困扰世界科学家的重大问题时,他们没有比这大得多的了。您在哪里安全地埋葬着超过28,000立方米〜大约六座大本钟钟楼-未来一百万年的致命放射性废物?寻找储藏地点的小组成员米兰达·施雷尔斯(Miranda Schreurs)教授说,这是德国在未来几年关闭所有核电站时面临的“邪恶问题”。专家们现在正在寻找某个地方来掩埋将近2000个容器的高放射性废物。该地点必须在坚如磐石之外,没有地下水或地震可能引起泄漏的地方。

著录项

  • 来源
    《Nuclear waste news 》 |2019年第20期| 7-8| 共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号