...
首页> 外文期刊>Nuclear regulation reports >NRC Not Required To Examine Terrorist Threat to Nuclear Plant
【24h】

NRC Not Required To Examine Terrorist Threat to Nuclear Plant

机译:无需NRC检查对核电厂的恐怖威胁

获取原文
获取原文并翻译 | 示例

摘要

The Nuclear Regulatory Commission (NRC), when it is reviewing an application to relicense a nuclear power facility, is not required by the National Environmental Policy Act to examine the environmental impact of a hypothetical terrorist aircraft attack on that nuclear power facility, the U.S. Court of Appeals for the Third Circuit has ruled. The New Jersey Department of Environmental Protection (NJDEP) contended that NEPA required the analysis of the impact of such an attack in relicensing proceedings for the Oyster Creek Generating Station.
机译:美国国家环境政策法不要求核监管委员会(NRC)在审查重新许可核电设施的申请时,不得审查假想的恐怖飞机袭击该核电设施的环境影响,美国法院第三巡回上诉法院已裁定。新泽西州环境保护部(NJDEP)辩称,NEPA需要分析这种攻击对牡蛎溪发电站进行许可程序的影响。

著录项

  • 来源
    《Nuclear regulation reports 》 |2009年第1414期| 1-1| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号