Extensive planning and preparation ensure that Loviisa's annual refueling outages are conducted safely and on schedule. The role of outage manager at the Loviisa nuclear power plant, explained Tore Vonka, is mainly a supervisory one. As shown in the Controlling Model diagram (see Fig. 1), his role can best be described as "control and coordination." This description also reflects the general approach adopted for managing outages at Loviisa, which calls for "early and detailed outage planning." Furthermore, while outside contractors are used for peak work loads during outages, the planning, coordination, and monitoring of the outages is the plant personnel's responsibility.
机译:广泛的计划和准备工作确保Loviisa的年度加油中断安全且按计划进行。托雷·冯卡(Tore Vonka)解释说,洛维萨(Loviisa)核电站中断经理的角色主要是监督人员。如控制模型图所示(参见图1),他的角色可以最好地描述为“控制与协调”。此描述还反映了Loviisa管理中断所采用的一般方法,该方法要求“及早和详细的中断计划”。此外,尽管外部承包商在停电期间承担高峰工作量,但停电的计划,协调和监视是工厂人员的责任。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号