...
首页> 外文期刊>Nuclear news >NPIC&HMIT 2006: I&C regulatory challenges abound
【24h】

NPIC&HMIT 2006: I&C regulatory challenges abound

机译:NPIC&HMIT 2006:I&C法规挑战不胜枚举

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

As part of the 5th International Topical Meeting on Nuclear Plant Instrumentation, Controls, and Human-Machine Interface Technology (NPIC&HMIT 2006), held alongside the 2006 ANS Winter Meeting, the Nuclear Regulatory Commission organized a panel session on regulatory challenges and approaches to advanced systems. The session, led by David Desaulniers, of the NRC's Office of Nuclear Reactor Regulation, focused on the integration of human factors into new nuclear power plant designs. Desaulniers made it clear that one of the challenges for the NRC is the lack of experienced staff for licensing new plants.
机译:作为与2006年ANS冬季会议同时举行的第五届核电站仪器仪表,控制和人机界面技术国际专题会议(NPIC&HMIT 2006)的一部分,核监管委员会组织了一次有关监管挑战和先进系统方法的小组会议。 。由NRC核反应堆法规办公室的David Desaulniers主持的会议着重于将人为因素整合到新的核电站设计中。 Desaulniers明确表示,NRC面临的挑战之一是缺乏经验丰富的新工厂许可员工。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号