Hart and McCollum: An overhead job at Oconee

机译:哈特和麦科勒姆:Oconee的日常工作

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

An ambitious refueling outage was completed last fall at Duke Energy's Oconee-3 nuclear power plant. In addition to the refueling work, activities included the replacement of control rod drive cables and the inspection and repair of some Alloy 600 welds on reactor vessel penetrations. The largest job, however, involved abating and recoating half of the carbon steel liner plates in the dome of Unit 3's containment building. The job was necessary due to the aging of the 35-year-old coating system-consisting of a zinc primer and a top layer of enamel paint-on the liner plates. Paint chips were flaking off the liner plates and falling down inside the containment building, causing plant operability concerns.
机译:去年秋天,杜克能源公司的Oconee-3核电站完成了一次雄心勃勃的加油中断。除加油工作外,活动还包括更换控制杆驱动电缆以及检查和维修反应堆容器穿入孔处的某些600合金焊缝。然而,最大的工作是在3号单元安全壳的圆顶中消减并重新喷涂一半的碳钢衬板。由于衬板上有35年历史的涂层系统(包括锌底漆和顶层搪瓷漆)的老化,因此这项工作是必要的。油漆碎片从衬板剥落并掉落在安全壳内部,引起工厂可操作性问题。

著录项

  • 来源
    《Nuclear news》 |2008年第6期|p.36-39|共4页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 原子能技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号